In 2016 / 2017 Eastbrook School decided to invest £23m and create 3 new blocks, Primary, Secondary and Specialist; to house a total of 2,900 students.
Paramount Group where engaged to deliver a new Site Wide network infrastructure throughout the entire site. The new network infrastructure would encompass Equipment Cabinets, Optical-fibre Backbone, Voice Backbone and a new Cat6 LSZH Structured Cabling System throughout.
Working alongside Wates. Paramount Group delivered a total of 3,000+ Cat6 LSZH outlets, 16 Server Cabinets, full 10G Optical-fibre backbone and a telecoms backbone infrastructure throughout all buildings. Works where completed within the timescales originally agreed and within budget.
Working on this project with Wates was testament not only to our ability to deliver high density network infrastructures of this size, but also our ability to be flexible with a demanding timescale and ever changing system requirements.